YEAR |
PROJECT DESCRIPTION |
CLIENT |
|
2017 |
Topographic and Underground Magnetic Detection Survey works for Additional Cold Storage Facilities at DAS Island. |
Abu Dhabi Gas Liquefaction Company Limited (ADGAS) |
|
2017 |
Topographic and Underground Utilities Survey, Reports and Drawings Preparation Services. |
NBTC Group |
|
2017 |
Topographic Survey for Replacement of GAS metering Skid & Enhancement of Flow Control. |
Tebodin Middle East Ltd. |
|
2017 |
Road Construction Survey Support Services for EPC for Mender Field Dev. Phase-I. |
Noor Al Sahara Gen. Cont. LLC |
|
2016 |
Topographic and Underground Magnetic Detection Survey works for 3 years Call‐Out Contract for ASR Gas Facilities in ASAB (PACKAGE “B”). |
ALSA Engineering & Construction |
|
2016 |
Topographic and Under Ground Magnetic Detection Survey works for OGD-1 Trunkline Replacement Project. |
Al Asab Est. Gen. Transp. & Contracting |
|
2016 |
Topographic and Under Ground Magnetic Detection Survey works for EPC for Tie In Works at South East - Package A (ADCO Asab & Sahil Area). |
Al Asab Est. Gen. Transp. & Contracting |
|
2015 |
Topographic and Under Ground Magnetic Detection Survey works for Gas Pipeline Centerline Verification & Survey of Pipelines Corridor Project. |
Bin Sari Specialized Technologies (BSS) |
|
2015 |
Topographic and Under Ground Magnetic Detection Survey works for Flowline Construction works of Bb-1073 (AP-03) Gasline and Re-routing of Bb-487/488. |
ALSA Engineering & Construction |
|
2015 |
Geotechnical Survey works for all proposed 33Kv Overhead Transmission Line for Mender Field Development Project. |
National Construction Company (NCC) |
|
2015 |
Topographic, Geotechnical and Under Ground Magnetic Detection Survey for all Water Injection Clusters, Gas Stations and Trunkline/Flowline Networks for Mender Field Development Phase-I. |
China Petroleum Engineering & Construction Corporation (CPECC) |
|
2015 |
Topographical & Magnetic Detection Survey for New Power Upgrade Power System Study & Feed at BAB, Bu Hasa, ASAB and SHAH Fields. |
SIEMENS LLC |
|
2015 |
Topographical & Magnetic Detection Survey for EPC of BAB Produced Water Re-Injection Project. |
Galfar Engineering & Contracting |
|
2015 |
Underground Detection and Topographical Survey for OGD-II Flowlines Rehabilitation Project : Installation of Isolation Valves Stations and Replacement of Corrored 6" & 8" Flowlines. |
ALSA Engineering & Construction |
|
2014 |
Topographical & Underground Survey works for ASAB Facilities Upgrade Project. |
CH2M Hill |
|
2013 |
Topographical & Underground Survey works for Feed for Nitrogen Gas Injection (NGI) Project. |
ALSA Engineering & Construction Co L.L.C. |
|
2013 |
Topographical Survey works for Constuction work for ASR Gas Wellhead & Flowline Installation at BAB & ASAB. |
ALSA Engineering & Construction Co L.L.C. |
|
2013 |
Topographical & Geotechnical Survey Works for New 3.3 MOL between BAB CDS and MP-21. |
ADCO
Abu Dhabi |
|
2012 |
Topographical & Geotechnical Survey works for the Engineering Services of OGD-I Trunkline Replacement and Rehabilitation of OGD-III Flowlines and Trunklines and Habshan Direct Depressurization. |
ADCO
Abu Dhabi |
|
2012 |
Flow line of Gas well No.Bb-475, BAB - ADCO Field. |
ADCO
Abu Dhabi |
|
2012 |
Flow line of 12 Gas wells (74 Km), BAB - ADCO Field. |
ADCO
Abu Dhabi |
|
2011 |
Setting out of substation location at Yas Island. |
AHBC Yas Island
|
|
2011 |
Establishing Survey Control Stations at Fujairah. |
AHBC Fujairah
|
|
2011 |
Setting out breakwater and under water boundary wall level checking, 48" Gas and Crude Oil Pipeline from section 1 to 20, Row edges from section 1 to 27 and collecting ground level sand Tope details along the route. |
AL Areej |
|
2010 |
Earthwork Quality calculation of proposed well location at Bubasa, BAB and ASAB |
AL Ashfao Transport & General Contracting |
|
2010 |
Topographic survey. |
AL Dhafra Termol |
|
2010 |
Setting out of pile points. |
AL Dhana Contract & Maintenance |
|
2010 |
Hiring of survey equipments. |
A.L.E. |
|
2009 |
Post concrete dimensional checking of Anchor bolts and leveling. Verification of plumpness at structural steel and leveling checking and correcting veticality old levels at the structural steel established. |
AL Fath Engineering |
|
2009 |
Commercial building in front of Abu Dhabi Mall pile, Rashid Mohd. Abdulrahman Fahieem Villa at Umm AL Nar. |
AL Ittimad Foundation EST |
|
2009 |
Proposed gas pipeline route 19km 7 3 well head area, Engineering & Construction for the tie-in of Gas Wells Bb-741, Bb-742, Bb-743 & associated flow lines. |
ALSA Engineering & Construction Co L.L.C. |
|
2009 |
36' gas pipeline route and establishing survey control stations at Thaweela Supply of Sales Gas to EMAL. No.144553. |
ALSA Engineering & Construction Co L.L.C. |
|
2009 |
Setting out axis of fabrication shop at Hamriya Free Zone Sharjah, Equipments at Dubai Investment Park. |
AL Tuwairqui Group of Companies - KSA |
|
2009 |
Setting out Footings. |
Abdulla Bindesnal |
|
2008 |
Establishing control station, setting out new administration - Building in Gasco Plant. |
Abnormal Load Engineering |
|
2008 |
Setting out of points. |
AL Jazira Metal Industries |
|
2008 |
Earthwork survey and cut / fill calculation. |
AL Rafa Transport General Contracting |
|
2008 |
Topographic survey, marking centre line for optic cable. |
AL Rahan Electro Mechnical |
|
2008 |
Setting out of pile points. |
AL Hadeer General Contracting |
|
2008 |
Rechecking all control points levels and Topographic survey at officers club. |
AL Masood |
|
2008 |
Making pile centre. |
AL Shmandi General Contracting |
|
2008 |
Hiring survey equipments. |
Arab Contractors |
|
2007 |
Transition piece level, tangent line marking, pile cut off level checking jacket bracing beam level and tide observation at Thailand. |
Arclight |
|
2007 |
Setting out of manhole points establishing new bench marks, Setting out points for pipeline level marking transfer, Establishing new control points joint survey with consultant, Fixing of fence for control points centr line checking setting out of pipeline, Marking drainage line, checking sewerage line setting out of SWD line, combined inspection of control points with consultant, Point 26 B inspetions with consultant, Point 26 B corner flag marking collecting coordinate of asphalt roads, coordinate calculation point 26, Preparing OGL report for setting out point, prepare precut post cut level schedules and AutoCAD drawing &calculate cut / fill volume. |
Arabtech |
|
2007 |
Setting out of steel structural buildings. |
ASCS |
|
2007 |
Setting out of pipeline at Dubai Dera. |
Bin Sqer |
|
2007 |
Proposed chilled water pipeline 35 km in Dubai Motor City and preparing profile drawings. |
CAT |
|
2006 |
48" water pipeline from Mirfa pump house to Liwa pump house - 150km x 60 mtr for ADWEA project, The proposed water line extensions at Gayahi for ADWAE project, 25 km spirit leveling from Gayathi up to ADWAE project and proposed 48" water pipeline from Madinat Zayed to Liwa pump house. |
Dr. MH ALI EL SALE Consultants Engineers |
|
2006 |
Setting out pile points. |
Dipon Gulf General Contracting |
|
2006 |
Pile and pile cap setting out of Abu Dhai University, Trail pile setting out at AL Reem Island, As Built survey of piles driven at Abu Dhabi University, Preparing pile layout drawing and coordinates for setting out at AL Raha Garden project, Preparing pile layout drawing and coordinates for setting out at Gulf Hotel Project and As built survey of piles driven at Gulf project. |
Dutch Foundation |
|
2006 |
Setting out excavation limits, Level checking stakeout. |
Dubai Industrial City |
|
2006 |
Pile point checking setting out of plot limits building line location, preparing setting out drawing and checking plot line diameters. |
E.D. Zublin |
|
2005 |
Pile point marking. |
Engineering Consortium & Construction |
|
2005 |
Setting out industria building in star cement factory. |
EMCO |
|
2005 |
SH. Villa at Gantoot. |
Fair Green International Land Scapping |
|
2004 |
Survey equipment hiring. |
Fugro Survey (Middle East) |
|
2004 |
Survey equipment hiring. |
Fugro Survey (Middle East) |
|